JQZ-Phoenix-AUV
CompletedLoading map…
PortTrack / waypointPlanned routeMooring / vehicle
Planned route: 33 segments · ~15 days steaming · 8 stations
Operating area: western equatorial Pacific/Marshall Islands/Micronesia
›2 legs· Apra (Agana) - Guam → Apra (Agana) - Guam
- 1Apra (Agana) - Guam→Apra (Agana) - GuamJan 29 – Feb 19, 2026 · 21 d
- 2Apra (Agana) - Guam→Apra (Agana) - GuamFeb 22 – Mar 15, 2026 · 22 d
Jan 29 – Mar 15, 202646 days at seaactual: departed Jan 29, 2026, arrived Mar 15, 2026
Projects aboard (2)
Sentry Engineering
24 hours of Sentry Engineering and training dives to piggy back SME 23/3771 JQZ-Phoenix AUV
People aboard
Sentry Engineering
- Sean Kelley · Chief scientist
- Ben Pietro · Principal investigator
JQZ-Phoenix-AUV
- Masako Tominaga · Principal investigator
Party size: 17
Estimated vacant berths: 18
Equipment
Aboard the vessel
- Crane
- Navigation - Heading/Position
- Dynamic Positioning (DP)
- Echosounder, 3.5kHz CHIRP
- Ultra-Short Base-Line Acoustic Navigation System
- Echosounder, 12kHz
- Pinger, 12kHz
- ADCP/UHDAS – range < 80m (eg. 300kHz)
- ADCP/UHDAS – range 500-750m (e.g. 75kHz)
- Multibeam - Mid-Water (EM302/304)
- Ship Fitted Winches & Wires
- Overboarding Cable - Fiber Optic
- Crane
- Stern A-Frame
- Navigation - Heading/Position
- Dynamic Positioning (DP)
- Echosounder, 3.5kHz CHIRP
- Multibeam - Deep Water (EM122, EM124)
- Ultra-Short Base-Line Acoustic Navigation System
- Acoustic Centerboard/Drop Keel/Transducer Pole
Pooled / portable
- CTD
- XBT
- TowCam
- Gravimeter
- Magnetometer (towed)
- WHOI MISO Camera System
Science party brings
- Science-provided vans ×2
Schedule data from UNOLS Marine Facilities Planning · operator cruise code TN-449 Phoenix-AUV N · MFP references 25/6363, 23/3771 · synced Sep 30, 2026
