VesselConnect

CA Seabed (Jason)

Completed
Sally Ride

Sally Ride

Scripps Institution of Oceanography · USA

Loading map…
PortPlanned routeStation

Planned route: 48 segments · ~3 days steaming · 47 stations

Operating area: Central CA slope

Route: Alameda (California) - United States → San Diego (California) - United States


Oct 21 – Nov 2, 202512 days at seaactual: departed Oct 21, 2025, arrived Nov 2, 2025

Open the fleet timeline


Projects aboard (2)

Jason Engineering - Sally Ride

24 hrs. of Jason engineering time to piggy-back on the CA Seabed project - SME 23/3789 on Sally Ride in September '25. Preferably to take place before operations for the start of the primary project.


People aboard

Jason Engineering - Sally Ride

  • Kevin Kavanagh · Principal investigator
  • Matt Heintz · Chief scientist

CA Seabed (Jason)

  • Kelly Dorgan · Principal investigator

Party size: 18

Estimated vacant berths: 8

Equipment

Aboard the vessel

  • Dynamic Positioning (DP)
  • Ultra-Short Base-Line Acoustic Navigation System
  • Stern A-Frame
  • Ship Fitted Winches & Wires
  • Overboarding Cable - Fiber Optic
  • Navigation - Heading/Position
  • Stern A-Frame
  • Dynamic Positioning (DP)
  • Echosounder, 12kHz
  • Echosounder, 3.5kHz CHIRP
  • ADCP/UHDAS – range 1000m-1200m (e.g. 38kHz)
  • Multibeam - Deep Water (EM122, EM124)
  • Ultra-Short Base-Line Acoustic Navigation System

Pooled / portable

  • Winch Pool Portable Winch
  • CTD
  • Other Seafloor Sampling Equipment
  • Other AUV

Science party brings

  • Portable Laboratory Vans/Containers - Science Supplied
  • Science-provided vans
  • Science Supplied Portable Winch
  • Science-provided vans
  • Portable Laboratory Vans/Containers - Science Supplied

Schedule data from UNOLS Marine Facilities Planning · operator cruise code SR2524 Dorgan · MFP references 24/4853, 23/3789 · synced Sep 30, 2026