VesselConnect

EPR-950 Hydrothermal 24

Completed
Atlantis

Atlantis

Woods Hole Oceanographic Institution · USA

Loading map…
PortStation

Operating area: EPR 950N East Pacific Rise axis near 9 50'N and 104 16'W

Route: Golfito (Puntarenas) - Costa Rica → San Diego (California) - United States


Feb 17 – Mar 19, 202431 days at seaactual: departed Feb 17, 2024, arrived Mar 19, 2024

Open the fleet timeline


Projects aboard (3)

2024 Sentry Engineering

No description for this project yet.


People aboard

2024 Sentry Engineering

  • Sean Kelley · Chief scientist
  • Kevin Kavanagh · Principal investigator

ALVIN Engineering Dives

  • Jill McDermott · Chief scientist
  • Rick Chandler · Principal investigator

EPR-950 Hydrothermal 24

  • Jill McDermott · Principal investigator
  • Jill McDermott · Chief scientist

Party size: 24

Estimated vacant berths: 13

Equipment

Aboard the vessel

  • Overboarding Cable - Fiber Optic
  • Crane
  • Stern A-Frame
  • Navigation - Heading/Position
  • Dynamic Positioning (DP)
  • Echosounder, 12kHz
  • Multibeam - Deep Water (EM122, EM124)
  • Ultra-Short Base-Line Acoustic Navigation System

Pooled / portable

  • CTD
  • XBT
  • TowCam
  • WHOI MISO Camera System

Schedule data from UNOLS Marine Facilities Planning · operator cruise code AT50-21_McDermott_Al · MFP references 23/3560, 23/4024, 23/3040 · synced Sep 30, 2026