VesselConnect

StratiFIED-NBS-2026-1 of 2

Completed
Sikuliaq

Sikuliaq

University of Alaska Fairbanks · USA

Loading map…
PortTrack / waypointPlanned routeStationMooring / vehicle

Planned route: 47 segments · ~4 days steaming · 37 stations

Operating area: Northern Bering Sea

Route: Nome (Alaska) - United States → Nome (Alaska) - United States


Sep 2 – Sep 17, 202615 days at seaactual: departed Sep 2, 2026, arrived —

Open the fleet timeline


Projects aboard (2)

Alaska Coastal Cooperative Mooring Cruise

NSF Directorate for Geosciences Office of Integrative Activities


People aboard

Alaska Coastal Cooperative Mooring Cruise

  • Chris Maio · Principal investigator

StratiFIED-NBS-2026-1 of 2

  • Sarah Mincks · Principal investigator

Party size: 20

Estimated vacant berths: 4

Equipment

Aboard the vessel

  • Dynamic Positioning (DP)
  • Multibeam - Shallow-water (EM710/712/2040/Seabat 7100)
  • Multibeam - Mid-Water (EM302/304)
  • Ship Fitted Winches & Wires
  • Overboarding Cable - Copper Conductor(s)
  • Overboarding Cable - Fiber Optic
  • Crane
  • Stern A-Frame
  • Navigation - Heading/Position
  • Dynamic Positioning (DP)
  • Underway Seawater System
  • Meteorological Data
  • Echosounder, 12kHz
  • Pinger, 12kHz
  • ADCP/UHDAS – range < 80m (eg. 300kHz)
  • ADCP/UHDAS – range 500-750m (e.g. 75kHz)
  • Biological multi-frequency echosounder - EK80

Pooled / portable

  • CTD
  • Other ROV
  • Winch Pool Portable Winch
  • CTD
  • Sediment Core

Schedule data from UNOLS Marine Facilities Planning · operator cruise code SKQ2608S · MFP references 23/2818, 24/4698 · synced Sep 30, 2026