Cable Route Survey
CompletedLoading map…
PortTrack / waypointPlanned route
Planned route: 7 segments · ~2 days steaming
Operating area: Major Hawaiian islands
Route: Honolulu (Hawaii) - United States → Honolulu (Hawaii) - United States
Oct 3 – Oct 8, 20264 days at sea
Project aboard
The Work consists of a submarine cable route geophysical survey in Hawaii State waters and the adjacent U.S. EEZ, as requested by Marker Offshore, LLC. The survey comprises three discrete offshore segments, two lines along each segment, as depicted in Figure B-1 below. All segments are conducted as dedicated survey passes; no intermediate port calls are planned.
People aboard
- Chris Kemp · Principal investigator
Party size: 6
Estimated vacant berths: 23
Equipment
Aboard the vessel
- Dynamic Positioning (DP)
- Underway Seawater System
- Meteorological Data
- Echosounder, 12kHz
- Echosounder, 3.5kHz CHIRP
- ADCP/UHDAS – range < 80m (eg. 300kHz)
- ADCP/UHDAS – range 1000m-1200m (e.g. 38kHz)
- Multibeam - Deep Water (EM122, EM124)
- Multibeam - Shallow-water (EM710/712/2040/Seabat 7100)
Pooled / portable
- CTD
- XBT
- Gyrocompass
Schedule data from UNOLS Marine Facilities Planning · operator cruise code KM26-12 KEMP CHARTER · MFP reference 26/7348 · synced Sep 24, 2026