NOPP2-GIW
CompletedLoading map…
PortTrack / waypointPlanned routeMooring / vehicle
Planned route: 3 segments · ~9 days steaming · 1 station
Operating area: Offshore of Amazon River mouth
Route: Bridgetown - Barbados → Bridgetown - Barbados
Sep 2 – Sep 17, 202615 days at sea
Project aboard
Deployment (and eventual recovery) of multiple full-ocean depth moorings to study the nonlinear transfer of energy in the internal wave field from tidal frequencies and wavelengths to super-tidal frequencies and shorter wavelengths. The goal is to improve numerical forecast models that recently have been able to include ever more realistic internal waves.
People aboard
- Drew Lucas · Principal investigator
Party size: 20
Estimated vacant berths: 0
Equipment
Aboard the vessel
- Ship Fitted Winches & Wires
- Crane
- Stern A-Frame
- Navigation - Heading/Position
- Dynamic Positioning (DP)
- Echosounder, 3.5kHz CHIRP
- Multibeam - Deep Water (EM122, EM124)
Pooled / portable
- CTD
- Winch Pool Portable Winch
Science party brings
- Science-provided vans ×2
Schedule data from UNOLS Marine Facilities Planning · MFP reference 24/5243 · synced Sep 24, 2026