Monterey Canyon internal-wave mooring turnaround
Open for bidsRecover and redeploy two bottom-mounted ADCP moorings on the axis of Monterey Canyon at 300 m and 800 m, and run a CTD section across the canyon head to tie the mooring record to the water-column structure. Day trips from Moss Landing; we need a vessel with an A-frame and a winch rated for the 800 m recovery.
- Target start date
- Nov 9, 2026 – Dec 4, 2026Three separate day trips within the window, weather permitting; a calm-weather day is needed for the 800 m recovery.
- Science days
- 3
- Where
- Monterey Canyon, off Moss Landing, CA
- Funding
- Funded · NSF OCE · OCE-2418867Ship time is in the award.
- Science personnel
- Adam Gent · Principal investigatorPriya Natarajan · Co-investigatorMarcus Oyelaran · Student5 total
- Gear requested
- CTD rosette, 12-bottle
- Shipboard ADCP
- Winch and A-frame for 800 m mooring recovery
- Mooring deck space, two mooring packages ×2